Auxiliary Equipment
Auxiliary equipment for racking plants: welding, powder coating, lifting and support systems, supplied alongside roll forming lines.
Machines in this category
3 machines listed. Every one is built to order and test-run on material before it ships.
-
Storage Rack Powder Coating Line
Storage Rack Powder Coating Line is specially designed to apply powder coating to storage racks, including uprights, beams and brackets. The storage…
View machine -
Rack Beam Welding Machine
Rack beam welding machine is used to weld rack beam and rack bracket together. Instead of traditional way of welding all beams manually by…
View machine -
Scissor Lift
Scissor Lift is mainly used to lift workers to high place for maintenance, repairs, cleaning, installation, etc. You can move it easily…
View machine
How to choose
Choosing within Auxiliary Equipment
What sits around the line
A roll forming line produces the profile; it does not finish the part. Beam welding closes the end plates onto a box beam. Powder coating gives the finished component its surface. Lifting equipment moves coils and finished bundles without a forklift in the aisle. Each of these is bought by the same plant, at the same time, from the same budget, which is why they are grouped here.
We supply the beam welding machine and the powder coating line as standalone units rather than as part of a forming line, because they run at a different takt and are usually installed in a different bay.
The racking itself
Alongside the machines we supply finished pallet racking for projects where the customer needs the storage system rather than the production equipment. It is a different business from machine building and it is quoted as a project, not as a line.
If you are a racking manufacturer, this group is probably not what you are here for — the four groups above cover the machines that make your product. If you are setting up a warehouse and need the storage itself, this is the entry point.
Buying order that usually works
In a new plant the forming line comes first, because everything else is sized around its output. Welding follows when beams are welded rather than self-locked. Coating comes last, and is often outsourced for the first year because a coating line needs volume to justify itself.
Lifting equipment is the one item that is easy to defer and expensive to defer: a plant that handles 3 m beams by hand loses more hours to handling than to forming. If you are specifying a line now and the budget is tight, ask us which of these can wait a year without constraining the line.
Not sure which line fits your profile?
Send the section drawing, the material and the output you need. We will come back with the machine configuration that produces it — and say so if a different process would suit you better.