The March 2022 shipment to Vietnam was the fifth order from the same customer: a beam line and a support bar line in one sea freight. Repeat orders like that say more about a machine than a catalogue does, and they ask something different of the supplier.

Grid
380 V / 50 Hz
First record
August 2020
Repeat business
fifth order, March 2022
Route
sea to Hai Phong or Ho Chi Minh City

What has shipped to Vietnam

A bracing line was test run for an existing customer in August 2020. An automatic box beam line followed in October 2020, producing heights from 90 to 200 mm with one operator running it end to end. Warehouse rack machines shipped in November 2020, and in March 2022 a beam line and a support bar line went together — the fifth order from that customer.

Shipments to Vietnam on record

Date What shipped Note
August 2020 Rack bracing line Test run for an existing customer
October 2020 Automatic box beam line 90 – 200 mm heights, one operator
November 2020 Warehouse rack machines Multi-machine shipment
March 2022 Beam line and support bar line Fifth order from the same customer

Dates are from the project notes on this site. The 2022 order is described as the fifth from that customer, so earlier machines predate the published record.

A fifth order is bought on a different basis

A first order is bought on price and specification. A fifth order is bought on the fact that the previous four are still running. By that point the customer is not comparing catalogues; they are adding capacity to a plant whose part mix is already set, and the new machines have to produce parts that assemble with the output of the four lines already on the floor.

That is a tighter requirement than each machine meeting its own drawing. Two lines that each hold their own tolerance can still produce parts that do not fit each other, if the tolerances are not aligned. On a repeat order the roll settings and the sample measurements from the earlier machines are on file, and the new line is set to the same reference rather than to the nominal drawing.

It also changes what the customer asks about. On a first order the questions are about price, stations and lead time. On a fifth they are about whether the spares are the same, whether the punch tooling is interchangeable, and how long a roll change takes in a plant that now has five lines competing for the same fitter.

Beam and support bar in one shipment

The pairing covers the load-carrying part and the part that stiffens the shelf above it. Both are consumed by the same bay and both are cut to length, but they run very differently. The beam line is heavier and slower, with a seam to close and usually a saw cut. The support bar line is light and fast, with no welding at all.

Putting them in one order is mostly logistics: two lines in one sea freight, one installation visit, one spares list. For a plant that is expanding rather than starting, that is worth more than a small price difference on either machine.

The 380 V build, and the option of road freight

Vietnam runs 380 V at 50 Hz, which is the standard build — one of the few markets where nothing changes electrically.

The shipping route is worth pricing on its own. Sea freight to Hai Phong serves the north and Ho Chi Minh City the south, and the inland leg from either port decides how the crates are packed. For a compact machine or a single former, road freight through the Pingxiang / Lang Son crossing into northern Vietnam avoids the sea leg altogether and is worth quoting against it. For a multi-container line it is not.

Built for this market

The machines in the Vietnamese orders

Each of these is a standard build quoted against your drawing, not a catalogue item. Where none of them fits, the custom range starts from the same components.

The other side

When buying the part is still cheaper

Vietnam has a deep subcontracting base for racking parts. That changes the arithmetic on a first line more than it does on a fifth.

You are under roughly 200 t a year on one section

The line will be idle more than it forms, and a local subcontractor with a loaded line will beat it on cost per metre until volume arrives.

You want one machine to make beam and support bar

They are different roll sets and different cut-off arrangements. One frame with two roll sets is a changeover nobody has costed; two machines or one machine plus bought-in bar are the honest options.

The section is not frozen

Every revision after roll design starts is new tooling. Agree the finished section with your customer before the order, not during the build.

Before you order

Questions this page usually raises

Is the machine built for 380 V, 50 Hz?

Yes. Vietnam is one of the markets where the standard 380 V / 50 Hz build needs no change, which also means no schedule risk from an electrical variant. Confirm the site voltage from a nameplate rather than from the grid standard — plants with their own transformer sometimes differ.

Do you ship by sea or by road?

By sea to Hai Phong or Ho Chi Minh City for a line, and by road through the Pingxiang / Lang Son crossing for a compact machine going to the north. Road avoids the sea leg but limits the crate size, so it is a configuration question as much as a freight question.

Can the new line match the tolerances of the machines already running?

That is the point of a repeat order. The roll settings and sample measurements from the earlier machines are on file, and the new line is set to the same reference so that parts from both assemble. Without that record, two lines can each be correct to their own drawing and still not fit together.

How long does a roll change take on the box beam line?

It is a shift-level job: stands opened, rolls swapped, pass line reset, first article formed and measured before production resumes. That is why the automatic build is quoted with a cassette or quick-release arrangement where the customer expects to change height often.

In production

Lines running in this market

Written up after commissioning, with the section, the strip and the constraint each project had to work within.

All case studies

Send the drawing and the output you need

The section drawing, the strip grade and the pieces per shift are enough to specify the machine — and enough to tell you if a different configuration would serve you better.

Back to export markets